Proven Bio-Energy Solutions

Real projects. Measurable results. Sustainable impact. Our case studies demonstrate how bio-energy technology transforms agricultural waste into valuable resources — delivering energy independence while boosting farm profitability across the UK.

Case Studies That Speak Volumes

From 50kW farm installations to multi-megawatt commercial plants, we've delivered bio-energy solutions that work. Every project tells a story of innovation, efficiency, and environmental stewardship.

Aerial view of completed anaerobic digestion facility with solar panels and biomass storage

Featured Projects

🏭

Norfolk Dairy Farm AD Plant

500kW anaerobic digestion facility processing 12,000 tonnes of organic waste annually. Generates enough electricity for 800 homes while producing 15,000m³ of digestate fertiliser.

Operational 2022

Cambridgeshire Biomass CHP

1.2MW combined heat and power system using locally sourced wood chip. Supplies district heating network serving 450 homes with 98.7% uptime achieved in year one.

Commissioned 2023
🌾

Suffolk Straw-to-Energy

Innovative pelletising facility converting 8,500 tonnes of wheat straw into premium fuel pellets. Created 12 local jobs while reducing farm waste disposal costs by 85%.

Active Since 2021
🔄

Essex Food Waste Processing

Regional anaerobic digestion hub processing 25,000 tonnes of food waste from 80 local businesses. Diverts 99.2% of organic waste from landfill while generating renewable gas.

Expanded 2024
Industrial biomass processing equipment with conveyor systems and storage silos

Project Spotlight: Lincolnshire Mixed Farm

When Thompson Farms approached us in 2021, they faced a common challenge — what to do with 15,000 tonnes of agricultural waste annually? Their solution? A bespoke 750kW anaerobic digestion plant that's transformed their operation.

The facility processes a mix of cattle slurry, crop residues, and energy crops. Within eighteen months, it generated £340,000 in additional revenue while cutting the farm's electricity bill by 78%. But the real winner? The environment — with carbon emissions reduced by 2,400 tonnes CO2 equivalent per year.

  • Feedstock: 15,000 tonnes/year mixed organic waste
  • Power Output: 750kW electrical capacity
  • Heat Recovery: 850kW thermal energy captured
  • Gas Production: 3.2 million m³ biogas annually
  • Digestate: 14,500 tonnes organic fertiliser produced
  • Jobs Created: 3 full-time positions

Performance Data Across Our Portfolio

47.2 MW Total Capacity Installed
156,000 Tonnes Waste Processed Annually
97.4% Average Plant Availability
£12.7M Client Revenue Generated (2023)

Client Outcomes & Success Stories

"The AD plant has completely changed our business model. We've gone from paying to dispose of waste to generating significant revenue from it. The team at Fenland Bio-Energy delivered exactly what they promised — on time and within budget."

— Sarah Mitchell, Managing Director, Greenfield Farms Ltd

Dairy Farm Transformation

Modern dairy farm with anaerobic digestion tanks and covered lagoon system

Converted 800-cow dairy operation from waste liability to energy asset. Annual savings of £85,000 on electricity plus £120,000 revenue from renewable energy certificates. Payback achieved in 6.2 years.

Poultry Producer Success

Biomass boiler installation with automated feed system for poultry farm heating

Biomass heating system using locally sourced wood chip reduced heating costs by 68%. Improved barn environment led to 12% better feed conversion rates. Total annual benefit: £45,000.

Arable Farm Innovation

Straw baling operation with modern equipment preparing biomass feedstock for processing

Straw-to-pellet facility adds £25 per tonne value to crop residues. Processing 3,000 tonnes annually generates £75,000 additional income while solving stubble management challenges.

Financial Performance Summary

Our projects consistently deliver strong financial returns. The average payback period across our bio-energy installations is 7.3 years, with many achieving faster returns due to rising energy costs and improved efficiency.

What sets our projects apart? Rigorous feasibility analysis, optimal plant sizing, and ongoing performance optimisation. We don't just build facilities — we ensure they deliver maximum value throughout their operational life.

7.3 Years Average Payback
14.2% Average IRR Achieved
£8.4M Client Savings (Annual)

Technical Insights From The Field

Optimisation Strategies That Work

After commissioning 34 bio-energy facilities, we've learned what separates high-performing plants from average ones. It's not just about the technology — it's about the details.

Take feedstock management. Our most successful AD plants achieve 15-20% higher gas yields through careful attention to C:N ratios, moisture content, and mixing protocols. Simple? Yes. Effective? Absolutely.

Temperature control is another critical factor. Our advanced monitoring systems maintain optimal digester temperatures within ±0.5°C, resulting in 98%+ methane recovery efficiency. The payoff? Higher energy output and more stable operation.

Lessons Learned

  • Pre-treatment matters: Proper feedstock preparation increases gas production by 12-18%
  • Maintenance scheduling: Planned downtime reduces unplanned outages by 67%
  • Heat integration: CHP systems with heat recovery achieve 85%+ overall efficiency
  • Digestate handling: Automated systems reduce labour costs by 40%
  • Remote monitoring: Early problem detection prevents 89% of major failures

Innovation in Action

Our latest projects incorporate cutting-edge innovations that push performance boundaries. Advanced process control systems use machine learning algorithms to optimise feeding schedules and maximise biogas production. The result? Plants that consistently outperform design specifications.

🤖

Smart Process Control

AI-driven systems monitor 150+ parameters in real-time, automatically adjusting feed rates and mixing cycles. Results in 8-12% higher gas production compared to conventional control methods.

🔬

Advanced Analytics

Predictive maintenance algorithms analyse vibration, temperature, and power consumption data to predict equipment failures 2-3 weeks before they occur. Reduces unplanned downtime by 78%.

♻️

Circular Economy Design

Integrated nutrient recovery systems extract phosphorus and nitrogen from digestate, creating marketable fertiliser products. Adds £15,000-25,000 annual revenue per MW of capacity.

"The technical expertise at Fenland Bio-Energy is exceptional. They didn't just install our biomass system — they taught us how to optimise it for maximum efficiency. Our fuel costs dropped 62% in the first year alone."

— James Crawford, Operations Manager, Riverside Horticulture

Performance Benchmarking

How do our projects compare to industry standards? The data speaks for itself. Our anaerobic digestion plants achieve an average electrical efficiency of 42.1% compared to the UK average of 38.4%. Our biomass CHP systems deliver 87.3% overall efficiency versus the industry standard of 82.1%.

But efficiency is just one metric. Reliability matters too. Our plants average 97.4% availability — significantly higher than the industry norm of 93.8%. That translates directly to more revenue for our clients and faster payback periods.

42.1% AD Electrical Efficiency
87.3% CHP Overall Efficiency
97.4% Plant Availability

Ready to Write Your Success Story?

Every project starts with understanding your unique requirements. Our technical team provides detailed feasibility studies, financial modelling, and performance projections — helping you make informed decisions about bio-energy investments.